Orange and Equitix join MDM to build the Pisces cable linking Galway to Portugal
Orange and Equitix have formed a joint venture with MDM to build Pisces, a 3,125km subsea cable linking Ireland to France, Spain and Portugal. EU money backs the 16-fiber-pair system, expected in 2028, but no total cost was reported.
Reality
- Evidence50
- Adoption
- Not scored
- Hype gap+15
- Incentives60
- Confidence55
Google paid up to triple the going rate for fiber that routes around the Red Sea
Google paid two to three times the roughly 6 million euro going rate for backup fiber across Turkey, according to a person familiar with the deal. Most Europe-Asia cloud traffic still crosses the contested Red Sea strait, so the premium buys a route for the day a cable breaks.
Reality
- Evidence45
- Adoption35
- Hype gap+15
- Incentives55
- Confidence45
buildConfirmed2 publishers Petal keeps Anjana's 24 fiber pairs and puts two cores in every fiber, so throughput per pair stays near 20.8 Tbps and each of roughly a hundred repeaters has to amplify 96 cores in one body.
Perspective Coverage
3 publishers
- Builder
- Builder 42%
- Operator
- Operator 28%
- Investor
- Investor 30%
Reality
- Evidence45
- Adoption5
- Hype gap+20
- Incentives70
- Confidence60
Washington funds study on possible $14 billion subsea cable to Thailand, as state telco seeks co-investors
The US Trade and Development Agency agreed on Sept. 14 to fund a feasibility study for a trans-Pacific cable routed clear of the South China Sea. National Telecom in Bangkok has to assemble the consortium that pays for it.
Reality
- Evidence52
- Adoption15
- Hype gap+35
- Incentives62
- Confidence50
Meta aims to double Aurora's 497 terabits a second on cables it owns
Project Waterworth is designed to run past 50,000 kilometres across five continents, and the Aurora transatlantic system is due in service in 2028 at about 497 terabits per second. The cost is undisclosed.
Reality
- Evidence32
- Adoption15
- Hype gap+45
- Incentives58
- Confidence45
AWS's 420Tbps Japan cable to land in Washington via Quinault-owned Toptana's new cable station
The cable is AWS's project, but the landing station and backhaul at Ocean Shores belong to Toptana, a Quinault Indian Nation company that aimed to be live in 2025 and is only now breaking ground. Nothing carries traffic until 2029.
Reality
- Evidence38
- Adoption22
- Hype gap+32
- Incentives72
- Confidence52